The Start of Work on Site
While the clients still occupied the original house we were asked to install what would become the new drainage connection for the house that was about to be built. The drain would run across the remainder of the original house's garden and then track around that house to a large disconnecting manhole at the front of the property.
Drainage is such a great part - and the guts of any new build.
This work was done ahead of the build and before the original house was sold so there would be no disruption to the new occupants.
At the same time a temporary wooden fence was built across the garden to separate the new site from the existing arden.
So, with everything in place the old house could be sold and the new build could proceed.